FCC emergency shutdown Cepsa Huelva 2016

In 2016, the regenerator FC-V2 in the FCC Unit at La Rábida Refinery in Huelva suffered some unexpected damages that had to be repaired during and emergency shutdown that was performed by IDIP. The complete project, including design, supply, transport, mobilization of IDIP’s personnel to site and replacement of the damaged sector of the regenerator had a duration of just 14 days.