FCC TAR Galp 2014

In 2014, IDIP was awarded by GALP Energía with the contract for the FCC Unit Revamping at its refinery in Sines.

Main FCC equipment units replaced in the revamp (head, cone, bottom air distributor and combustion riser on the regenerator and the external riser in the reactor) were designed and manufactured by IDESA.

Main replacements were the regenerator head, which was replaced with the ‘medusa’ method including the cyclones, and the regenerator cone.