FCC Flue gas replacement TAR 2019 – EQUINOR (Mongstad, Norway)

In 2019 IDIP was awarded with a contract for the engineering, fabrication, supply and installation of the 64” flue gas line in the FCC Unit at Mongstad refinery during the turnaround scheduled for October 2019.

IDIP manufactured the 64” flue gas line in seven parts that were pre-assembled in three sets during the turnaround preparation works. IDIP also manufactured 21 flue gas vents.

The flue gas line and the flue gas vents were replaced during the turnaround period. At the same time, IDIP was also involved in the contract for the FCC reactor replacement in the same unit.